Skip to main content
Loading…
This section is included in your selections.

An accurate and complete survey of the land to be subdivided shall be made by a registered civil engineer or licensed land surveyor. All monuments, property lines, centerlines of streets, alleys and easements adjoining or within the subdivision shall be tied into the survey. The allowable error of closure on any portion of the final map shall not exceed 1110,000 for field closures and 1120,000 for calculated closures.

At the time of making the survey for the final map, the engineer or surveyor shall set sufficient durable monuments to conform with the standards described in Section 8771 of the Business and Professions Code so that another engineer or surveyor may readily retrace the survey. A monument shall be placed on at least one exterior boundary line prior to recording the final map. Other monuments shall be set as required by the City Engineer.