Skip to main content
Loading…
This section is included in your selections.

Yard” means an open space, other than a court, on a lot with a structure, which open space is required to be unoccupied and unobstructed from the ground to the sky, except for such encroachments as are specifically permitted by this code.

Yard, front” means a yard measured into a lot from its front lot line or lines. A required front yard shall extend the full width of the lot between its side lot lines.

Yard, secondary front ” means the secondary yard fronting a public street on a corner (exterior) lot.

Yard, rear” means a yard measured into a lot from its rear lot line; provided, that in cases where there is no rear lot line, the rear yard shall be measured into the lot from the rearmost point of the lot depth, parallel to said lot depth. A required rear yard shall extend the full width of the lot between its side lot lines.

Yard, side” means a yard measured into a lot from one or more of its side lot lines. A required side yard shall extend between the required front yard and rear yard, or the front or rear lot lines in cases where no front yard or rear yard is required. (Ord. 1129 Exh. A § 1, 2019; Ord. 1111, 2018)