Skip to main content
Loading…
This section is included in your selections.

A. Telecommunications facility shall not be sited or operated in such a manner that it poses, either by itself or in combination with other such facilities, a potential threat to public health. To that end no telecommunications facility or combination of facilities shall produce at any time power densities in any inhabited area as this term is defined in Chapter 17.08 SMC that exceed the FCC adopted NIER standard for human exposure, as amended from time to time.

B. Initial compliance with this requirement shall be demonstrated for any facility within 400 feet of residential uses or sensitive receptors such as schools, churches, hospitals, etc., and all broadcast radio and television facilities, regardless of adjacent land uses, through submission, at the time of application for the necessary permit or entitlement, of NIER calculations specifying NIER levels in the inhabited area where the levels produced are projected to be highest. If these calculated NIER levels exceed 80 percent of the NIER standard established by this section, the applicant shall hire a qualified electrical engineer licensed by the State to measure NIER levels at said location after the facility is in operation. A report of these measurements and his/her findings with respect to compliance with the established NIER standard shall be submitted to the Planning Director. Said facility shall not commence normal operations until it complies with, or has been modified to comply with, this standard. Proof of said compliance shall be a certification provided by the engineer who prepared the original report. In order to assure the objectivity of the analysis, the City may require, at the applicant’s expense, independent verification of the results of the analysis.

C. Every telecommunications facility within 400 feet of an inhabited area and all broadcast radio and television facilities shall demonstrate continued compliance with the NIER standard established by this section. Every five years a report listing each transmitter and antenna present at the facility and the effective radiated power shall be submitted to the Planning Director. If either the equipment or effective radiated power has changed, calculations specifying NIER levels in the inhabited areas where said levels are projected to be highest shall be prepared. NIER calculations shall also be prepared every time the adopted NIER standard changes. If calculated levels in either of these cases exceed 80 percent of the standard established by this section, the operator of the facility shall hire a qualified electrical engineer licensed by the State to measure the actual NIER levels produced. A report of these calculations, required measurements, if any, and the author’s/engineer’s findings with respect to compliance with the current NIER standard shall be submitted to the Planning Director within five years of facility approval and every five years thereafter. In the case of a change in the standard, the required report shall be submitted within 90 days of the date said change becomes effective.

D. Failure to supply the required reports or to remain in continued compliance with the NIER standard established by this section shall be grounds for revocation of the conditional use permit or other entitlement use. (Ord. 1123 § 3 (Exh. A § 4), 2019)