Skip to main content
Loading…
This section is included in your selections.

A. The purpose of these provisions is to prescribe the procedure for the review of the design and appearance of new development within the City. A design review permit shall be required for all new development or expansions to existing development as follows:

1. New residential developments of three or more contiguous lots in any district and a total of three or more new residential units;

2. New single-family residences in new residential subdivisions of three or more units; and

3. Proposed buildings or substantial additions or other substantial exterior modifications to existing buildings for which a building permit is required in districts other than single-family or duplex districts;

B. The following shall be exempt from the requirement for a design review permit:

1. Rooftop photovoltaic installations shall not require design review unless the Planning Director determines that review is appropriate due to unusual characteristics of the installation or building. (Ord. 1111, 2018)