Skip to main content
Loading…
This section is included in your selections.

A development permit shall be obtained before any construction or other development, including manufactured homes, within any area of special flood hazard established in SMC 15.16.070. Application for a development permit shall be made on forms furnished by the City of Sebastopol. The applicant shall provide the following minimum information:

A. Plans in duplicate, drawn to scale, showing:

1. Location, dimensions, and elevation of the area in question, existing or proposed structures, storage of materials and equipment and their location;

2. Proposed locations of water supply, sanitary sewer, and other utilities;

3. Grading information showing existing and proposed contours, any proposed fill, and drainage facilities;

4. Location of the regulatory floodway when applicable;

5. Base flood elevation information as specified in SMC 15.16.070 or 15.16.140(C);

6. Proposed elevation, in relation to mean sea level, of the lowest floor (including basement) of all structures; and

7. Proposed elevation in relation to mean sea level to which any nonresidential structure will be floodproofed, as required in SMC 15.16.170(C)(2) and detailed in FEMA Technical Bulletin TB 3-93.

B. Certification from a registered civil engineer or architect that the nonresidential floodproofed building meets the floodproofing criteria in SMC 15.16.170(C)(2).

C. For a crawl-space foundation, location and total net area of foundation openings as required in SMC 15.16.170(C)(3) and detailed in FEMA Technical Bulletins 1-93 and 7-93.

D. Description of the extent to which any watercourse will be altered or relocated as a result of proposed development.

E. All appropriate certifications listed in SMC 15.16.140(E). (Ord. 1084, 2016)