Skip to main content
Loading…
This section is included in your selections.

A. Requests by the subdivider or the subdivider’s engineer for revisions to the approved plans appearing necessary or desirable during construction shall be submitted in writing to the City Engineer or authorized representative and shall be accompanied by revised drawings showing the proposed revision. If the revision is acceptable, the revised plans shall be submitted to the City Engineer’s office for initialing. The originals shall be returned to the subdivider’s engineer and copies of the revised plans shall be immediately transmitted to the City Engineer. Construction of any proposed revision will not be permitted to commence until revised plans have been received and approved by the City Engineer.

B. When revisions are deemed necessary by the City Engineer to protect public health and safety, or as field conditions may require, a request in writing indicating the revisions shall be made to the subdivider and engineer. The subdivider’s engineer shall revise the plans and transmit the originals to the City Engineer for initialing within the time specified by the City Engineer. Construction of all or any portion of the improvements may be stopped by the City Engineer until revised drawings have been submitted and approved. The subdivider may appeal revisions required by the City Engineer to the City Council by filing a written appeal with the City Engineer and any required processing fee within 15 days following receipt of the request to revise the plans.

C. Costs incurred by the City for the checking of plans or calculations or inspection as a result of revisions to the approved plans shall be borne by the subdivider. A deposit, when required, shall be submitted with the revised prints and applied toward the actual costs.